Start regional supply chains norway Finnøy bioenergy

Finnøy bioenergy

E-mail Print PDF

Stage 0

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 0 – General vision      
3 Sustainable indicator Vision Enablers Indicators Level units Comments/Gaps
5 Economic Keep value-creating in the agriculture Large-scale contra smallscale operation Capasity 8 mill kwh Estimated potensial. Based on manure, but can theoretically be more with other ingredients
6 Social - cultural “The green region” - The green community Increase greenhouse production as “green products” based on biogasenergy Positive image New renewable energy Co2 used back to growing plants >80% rating (questionaire)  
7 Economic Keep the position as the greenhouseregion no.1 in Norway Biogas New renewable energy production 6 mill. kwh in step 1 within 2013
8 Social Build up a strong greenhouse cluster Education at local/regional academy - operating staff Level of knowledge realise one project with greenhouse cluster Then the result is that it will end out in some concret
9 Ecologic Stabilies climate challenges Less pollution – less use of non-renewable recourses Saving of Co2, and new renewable energyproduction Change from fossile energy to bio energy for more than 2 HA HA =Hectar Greenhousearea
10 Soc - ecol Easy progress Make Ros-analysis scheme Scheme to be used by municipality   Under progress
11 Economic Increase agricultural profit Reducing fertilizing production budget New energyproduction Energy performance Improved efficiency Get more than 3 Nok/kg 'green ' tomato Min 10 % increase (The sum of less expenses and more income)
12 Economic Protect/conserve agricultural areas New energyproduction Reducing fertilizer budget Area Min. 42 MS in Norway MS = marketshare or prosent
14 Storyline: In Norway the electrisityprice are low. That are making problems to get good economy in biogasprojects.        
15   The department are working with green sertificates for new renewable energy, but the frameworkconditions are not ready.        
17   CHP can get green sertificates, but not if its get money from Enova or Innovation Norway        

Stage 1

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 1 – Material supply      
3 Sustainable indicator Targets Enablers Indicators Level units Comments - Gaps
5 Ecol Less use of fertilizer Use of waste from biogasproduction, we have to eksport as much as we import Quantity of fertlizer Reduce use of fertilizer with min 10 %  
6 Ecol Ensolve problems with to small spreadareas Production of biogas -Breed improvement of wasteproduct Quantity in and out from plant Step 1 22ooo m3 cattle manure 18 000 cattles and 4000 pigs = 22 000
7 Econ Find useful use of “organic waste” Rawmaterials to biogasproduction: Use local rawmaterials Tons of rawmaterials needed in the biogasreactor 2000 tons of 'salmon 3000 ton pigsmanure 1500 ton manure hens 11000 cattlemanure salmon from Grieg seafood. 40-70 N-øre pr. kg. Today the farmers pay about 5 Nok kg to destruate dead hens leaves from tomatoproduction in step 2
8 Econ Find useful use of “waste” from biogasproduction Fertilizer for sale and own use - less fosfor in future - big value Quality: Use purpose Price Form (liquid/firm) Develop a reciep for sale of posphor(fosfor) Research - Take out phospfor as a clean product (fragmentation) - BATMAN-project (Bioforsk og CBMI) Have not secured manure, No agreements, Have not secured waste from fishindusty
9 Econ/ecol Easy start up Bring bacteriaculture from Åna fengsel(jail) Price and quality   Better and eaisier than researching and development (fou)
10 Sos Secure rawmaterial (enough) Make agreements of intensions Amount raw material Price and volume   Need min. 50 % of the farmers.

Stage 2

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 2 - Logistics      
3 Sustainable indicator Targets Enablers Indicators Level units Comments - Gaps
5 Econ - ecol Minimal transport, pollution, cost, time and investments #Coordinate out – and in transport #Ecuipment collaboration #Store collaboration Loads./. Weights, costs Price transport with own equipment 50 Nok/ton 15 m3 adherent (wagon) a 750 kr/hour = 50 Nok/ton Unsure
6 Soc - cult Ensure sos. Acceptance Info/communication Positive image >80% rating (questionaire)  
7 Ecological Eksport of nutriants Produce manure/fertilizer for export (heilgjødsel) Price for transport   Research
8 Ecological Minimal transport of rawmaterials to biogasproduction: #Fish from local fishfarms #Tomatoes from greenhouses #Manure from farms #Waste from households(food) Bigger units – capasity. Storestank, vehicle, boat Loads / weights Capasity Frequences Economy Transportnoice Transportsafety   Research

Stage 3

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 3 – Energy production      
3 Sustainable indicator Targets Enablers Indicators Level units Comments - Gaps
5 Soc Energy from biomass that is able to compete with naturegas and el. Build up local competence. Technical workers Level of knowledge Educate min 5 person each year - local Reasons for building av plant - Sentral questionaire: Shall the plant be build to solve problems with spreadareas (manuredirective and Eus waterframework), the wastequantity, the need to solve climatechallenges and meet the market by producing "green tomatoes", to solve the energyneed, or to secure and provide settlement.
6 Econ - soc Long-range profitt to the agriculture Local value-creating in all positions Employment, profit Keep the level up to days  
7 Econ Predictable trade of energy Levelling out periods with low use Price electrisity Price heat 50 øre/kwh max  
8 Ecol Minimize environmental impact Use CO2 and CH4 (metan) –supply to greenhouses, Use waste in agriculture Co2 equivalent, Quantities per waste type, size of spreadarea/land    
9 Econ Assure high materials efficiency Pretreatment, boiler- technology Continius optimization Energy performance Improved efficiency Total 12 mill nok in investmets Lundsby have give an offer to build the plant. Is at UIS for qualitysecuring.
10 Econ Low operational costs Technology Costs per production unit 6-7 mill. kwh 40 øre kw/h drift.3 kr/kwh investment
11 Econ Low operational costs Financing Interest rate, security 6% Internrente
12 Econ Low operational costs Employees Competencies Best competence i Norway KER (Competence Energy Ryfylke) Project
13 Econ Assure high materials efficiency Process technology Energy performance Simular to 3 mill. kwh 40 øre kw/h drift.3 kr/kwh investment
14 Soc Provide and secure employment Cost/benefit calculation Employment Min 5 persons  
15 Soc - cult Ensure sosial acceptance PR/info campaign, collaboration with local authorities Positive image >80% rating (questionaire) Nothing done so far. Have invited several times to open meetings, but almost nobody is coming

Stage 4

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 4 – Grid distribution      
3 Sustainable indicator Targets Enablers Indicators Level units Comments - Gaps
5 Econ Energy for stakeholders use Short distance Localisation near tradearea Distance Max 1 km Because of to high costs connected to investments. Must maybe have several smaller plants
6 Econ Delivery of gas exsessed own use??? Delivering to Lyse Neo– existing gasnet Price gas - guaranties ? Lyse have to give costgaranties for min 20 years using their grids Alt 1. Own powerplant Alt 2. connecting to Lyse
7 Econ Hot water to municipal buildings Pipelines to be planned Price heat Price grid 50 øre /kwh + nett /grid rent 80 N-øre tot Unsure- only actual if the greenhouseconsept doesnt work
8 Econ Production of electrisity in periods Sale to main electrisitylines Price electrisity 50 øre /kwh + nett /grid rent 80 N-øre tot Unsure
9 Sos - econ Organisation by competence 1. Production of electrisity, gas 2. Technical solutions 3. Contractors 4. El. net and gridowners Competencelevel, references, costs Best know how about operation and biogas plant and grids in Norway Some contractors, producers of rawmaterials and energy and others try to get contracts within areas they dont have the right/nessesary competence

Stage 5

  A B C D E F
1   Supply chain Finnøy Bioenergy      
2   Process stage 5 - Consumption      
3 Sustainable indicator Targets Enablers Indicators Level units Comments
5 Part A: Econ - sos Greenhouses Stakeholders own production – via existing and new pipe-net Price electrisity Price heat 50 Øre/kwh  
6 Econ Municipal buildings Plant location – show lower price level for biogasheat contra hydroelectrical Price electrisity Price heat 50 øre/kwh  
7 Econ Private households Plant location – show lower price level for biogasheat contra hydroelectrical Price electrisity Price heat 50 øre/kwh  
8 Econ Industrial use Plant location – show lower price level for biogasheat contra hydroelectrical Price electrisity Price heat 50 øre/kwh  
9 Part B: Ecol Soilimprovement in the agriculture – own analysis Manureproducts from biogasplant Price 50 nok/ton 15 m3 adherent (wagon) a 750 kr/hour = 50 Nok/ton
10 Econ Extend the season of growth Production of tomatoes through the whole year Walue Increase production(longer season) with min 12 kg tomatoe/ square meter Average today are 40-45 kg/m2 - increase/step up with 12 kg/m2
11 Ecol Mantain the nutrean balance Biogas-waste from production to spreadarea and gardens Area Nutrean/m2 research
 